安装卷帘门窗常见的问题?

来源:http://www.jnhsjlm.com 日期:2021-07-15 发布人:hongshun
卷帘的上部顶板上,都要配置温感和烟感探头,侧墙上要安装三台强弱电控制设备,门的两侧还要安装两个控制按钮,所有的管路都要敷设在结构混凝土的墙体和顶板内。因此总包单位在组织各会审图纸之前,工程的建设单位、设计单位和工程总承包与地方消防管理的政府部门应该再次协商,把卷帘门的位置确定好。因为如果位置移动,要影响所有暗装管路的追位,处理的难度大。审图过程中要注意现场施工过程中经常出现的几种问题:
The upper roof of the rolling shutter should be equipped with temperature and smoke sensors, three strong and weak current control devices should be installed on the side wall, two control buttons should be installed on both sides of the door, and all pipelines should be laid in the wall and roof of the structural concrete. Therefore, before the general contractor organizes all specialties to review the drawings, the construction unit, the design unit, the general contractor and the local government department of fire management should negotiate again to determine the location of the rolling shutter door. Because if the position is moved, it will affect the tracking of all concealed pipelines, which is very difficult to deal with. In the process of drawing review, we should pay attention to several problems that often appear in the process of on-site construction
                   济南卷帘门厂
(1)建筑结构设计的位置同电气设计的位置不在同一座标位置上,斜坡道进出口的卷帘门建筑图纸设计在斜坡道上部,电气图纸设计在斜坡道的下部,有的建筑图纸上设计是两樘而电气图纸上是一樘等,然后都是由电气改管追位。
(1) The position of architectural structure design is not in the same coordinate position as that of electrical design. The architectural drawing of rolling shutter door at the entrance and exit of ramp is designed at the upper part of ramp, and the electrical drawing is designed at the lower part of ramp. Some architectural drawings are designed in two parts, while the electrical drawing is designed in one part, and then the electrical specialty changes the management and position.
(2)卷帘门滚筒超长,结构工程完成以后进不去,然后只能采取拆门或锯断主轴等被动措施来处理,如果在审图能及时发现此类问题,留好通道则完全可以避免。
(2) The roller of the rolling shutter door is too long to enter after the completion of the structural engineering, and then passive measures such as dismantling the door or sawing off the main shaft can only be taken to deal with it. If such problems can be found in time during the drawing review, the channel can be completely avoided.

推荐阅读/ Recommended reading

1、电机更换安装1 Motor replacement and installation电动卷帘门的电机与卷筒芯轴之间是由传动链条来连接,电机地脚用螺钉固定在链轮